The GDI pump pre-assembly enables the joining and testing of pump seals.
The individual components are fed in via vibrating pots.
A press is used to join the components in a position- or force-controlled manner. The press-in forces are monitored to detect any missing parts.
The finished components are checked for leaks in an airtightness station.
The tested parts are placed on a pallet, which is discharged from the system via a conveyor system.
Highlights
- Autonomous operation
- Automatic emptying of the vibratory bowls
- Integrated calibration of leakage measurement via built-in syringe
- Differentiation between different part defects
- Hand scanner for recording batch numbers
- Automatic mastering
Technical data
- Cycle time: >= 15 s
- Test pressure: 0 – 6 bar
- Measurable leak rate: 0 – 1.2 cc/min
- Press-in forces: 0 – 5 kN